Boots CS-1000 Bedienungsanleitung Seite 50

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 400
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 49
Notes
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
In order to upgrade a High Availability
system with a minimal loss of service we
first need to SPLIT the two cores so we
can login to the Standby side.
Once the SPLIT command has been
issued you will see the Standby system
initialise offering the overlays to login to.
(When the two cores are synchronised
the standby will be running background
tests and the overlays/login will not be
available although you can login with
PDT).
The ACTIVE core is still processing
calls for the system but will no longer try
to synchronise with the standby system.
At this point if we were carrying out an
upgrade we would now install the
upgrade to the Standby system and
check its validity before bringing it into
service.
CS 1000 Rel 7.5 16/04/2013
Copyright Amlex Associates Ltd
50
Seitenansicht 49
1 2 ... 45 46 47 48 49 50 51 52 53 54 55 ... 399 400

Kommentare zu diesen Handbüchern

Keine Kommentare